OEM Custom Injection Plastic LED LCD TV Frame Cover Mould Manufacturer
1.Offer you mould core & cavity steel certificate Liquid Oxygen / Nitrogen Plant
PSA nitrogen generator and PSA Oxygen Generator have similar principle. Molecular sieve as an adsorbent under the principle of pressure swing adsorption (PSA), will get nitrogen/oxygen from compressed air.
Perfect process design get high performance. Unique vacuum molecular sieve filling system and impacted technology increase the life of molecular sieve. Skid-mounted structure makes installation and transportation more convenient. With DCS controller system and remote output and control system. High automatic, unmanned operation.
Oxygen/Nitrogen/Argon Generation Plant/Gas Production Equipment Shenzhen KunPeng Precision Intelligent Technology Co., Ltd , https://www.rocairseparation.com
Product material: ABS,PC
Core&Cavity Steel:NAK80,2738
Steel hardness: HRC48-52
Mould Standard: DME
Cavity Number: 1
Injection System: Point GATE
Ejector System: EJECTOR PIN
Cycle Time: 40~50S
Tooling lead time: 60DAYS
Mould life: More than 1000, 000SHOTS
Quality assurance: ISO9001
Our Advantage
1. High quality
2. Reasonable price
3. On time delivery
4. Good After-sale service
5. Strict quality control
6. All the mould are automotic.
Offer you
In-time response on letters, telephone calls or fax
In-time supply the quotation and mould designs
In-time communication on the technical points
In-time sending pictures for the mould machining progress and mould finishing schedule
In-time mould test and sample delivery
In-time mould delivery.
For more information please contact us.
2.Offer you mould trial video
3.Mould process report
 Weekly report, mould trial video and samples for your checking
4.Spare parts
 wearing spare parts provided
FAQ:
Â
1.How about your quality control?
We have professional QC team to control mold quality from raw material,machining to the final mould testing parts,as we realize that quality control is the first priority to run business successfully,and the Quality is the life of enterprise.
2.What's your lead time?
For most mold,normally 45 to 60 working days ( not including Chinese official holidays ) after deposit received and mold drawings approved.
3.How to approval samples?
1) You can come to our factory to see the mold testing directly.
2) We could send samples by DHL, TNT, Fedex, and we can send mold running video and molding parts dimension inspection report to you by email.
4.What about your after service?
1 year under normal use procedure,Spare part which is non-man made damaged will be offered for free within one year, and you can contact us at any time if you need help.