Secondary Water Supply Improvement Project Boosts Pressure Pump Station and Water Meter Retrofit
Magnetic Cardboard Foldable Paper Box Magnetic Cardboard Foldable Paper Box,Magnet Paperboard Foldable Box,Glitter Paper Foldable Packaging Box,Custom Paper Cardboard Folding Box Shenzhen Xianglong Paper Product &Packaging Co.,Ltd , https://www.xlpaperbox.com
According to reports, over the years, because of the outdated secondary water supply equipment in the city and the aging of the branch line network, there are secondary pollution hazards in the urban water supply area, in order to allow urban residents to use clean water, safe water, relieve water, and improve the city. The water environment, Yanji City has recently launched a full-scale secondary water supply renovation project. The first phase of the project is scheduled to be completed in November this year. By then, 64,730 people will benefit from the project, benefiting a building area of ​​166.47 million square meters.
Yanji City will use 2 to 3 years to withdraw and reconstruct old and small secondary water supply facilities, renovate the old pipe network for secondary water supply, renovate old pipelines in residential buildings, implement water meters, and rationalize secondary water supply management. System, improve the price mechanism, establish a dynamic monitoring system for water quality.
This year, Yanji City plans to complete the expansion of 8 pumping stations and 16 pumping stations. It will reconstruct the pipelines of all retreated secondary pressure pumping stations in the service area by about 70 km; renovate the 107-km pipeline in residential buildings; Households will transform and replace 15,000 water meters; transform the roof and wall surface of 14 pump stations. The project will start with areas where the needs of the people are most urgent, the most contradictory, and the most effective, combined with the warm house project and the street reconstruction project. During the construction process, the construction party will minimize the impact on the residents' daily lives, facilitate the people, and avoid disturbances to the people, and strive to achieve the people's livelihood without disturbing the people.
It is understood that the total scale of the secondary water supply renovation project in Yanji City includes the upgrading and reconstruction of 12 pressurized pump stations, and the withdrawal of 27 pressurized pump stations; the renovation of 161.8 km of secondary water supply pipe network with a pipe diameter of more than 100 mm; transformation of residential buildings Pipeline 440 kilometers; water meter household transformation and replacement of 132,000 water meters. After the completion of the overall project, the beneficiary construction area reached 9.82 million square meters and the number of beneficiaries reached 262,600.