Leaching of wet zinc smelting roasting material (3)

A section of the hot acid leaching process is shown in the next two figures.

[next]

    Both processes belong jarosite process iron sink method, a first neutral leach residue is a flowchart of a direct thermal acid leaching. The second flow chart is that Ma Rongjun et al. proposed to add a low acid leaching between the neutral leaching and the hot acid leaching, and the low acid leaching liquid directly sent the immersion iron. The main difference between the two processes is the low acid leaching and pre-neutralization processes. The common point of the two processes is to achieve efficient use of the acid in the hot acid leaching section and to reduce the acidity of the iron removal solution. The difference is that one neutralizes the hot acid leaching solution with neutral leaching slag. The other is neutralization with calcine. The advantage of the above figure 1 is that the pre-neutralization section has a relatively low solid-liquid ratio and is advantageous for liquid-solid separation. The advantage of Figure 2 above is that the hot acid leaching section has less processing capacity, which saves equipment and energy consumption.
The technical conditions for a period of hot acid leaching are as follows:
Start acid 100 ~
200g /L
Final acid 30 ~
60g /L
Temperature 85 ~
95 °C
Time 3 ~ 4h
Liquid to solid ratio 6 to 10 ( leaching start)
The next two flow charts are examples of two stages of hot acid leaching and goethite iron removal process. The neutral leaching slag of the two processes is leached by a superheated acid after hot acid leaching, and the hot acid leaching liquid is directly sent to remove iron. The difference is that the heat and reductive acid leaching Wei Weiai combined in a process plant, the advantage by the addition of hot acid leaching of zinc sulfide concentrates having a reducing effect, and therefore promote the decomposition of Zn0 · Fe 2 0 3, and Speed ​​up the leaching rate. The thermal acid leaching of the Barron plant is at a temperature of 85 ~
90 ° C , the final acid 50 ~ 60g When the /L ratio is basically the same, the leaching and reduction times are 6h and 7h , respectively, for 13h . The combination of hot dip and reduction in the Vivel plant takes only 4 hours . The two factories have higher zinc leaching rates due to the increase in superheated acid leaching. The leaching rate of Zn0 is reported to be 99.9 %, the leaching rate of Zn0·Fe 2 0 3 is 98%, the leaching rate of ZnO is 90% , and the total leaching rate of zinc is 99.5% . Lead-zinc smelter in northwest China using multi-stage hot acid leaching process, to obtain good results. [next]

[next]

Expanded Metal Panel

Fence expanded net

They are used in highway fence nets and stadium fence nets.

√ Specific sturdy and durable

√ Beautiful and generous

√ Easy to maintain

√ Good visibility

√ Bright colors

Ship expanded net

Ship Expanded Metal Mesh is mainly used on large ships, and the platform laid on the ship plays an anti-slip effect. Mainly use high-quality hot-rolled steel plate.

√ Characteristics of sturdiness and durability

√ Good anti-slip effect

√ Low price

Plaster Expanded Net

Mesh surface is flat and the mesh connection is firm, the ventilation is good, and the price is cheap.

Added to the wall to prevent cracking , Shockproof and other functions.

Speaker expanded net

The speaker net can be used to protect the speakers.

√ Good sound transmission

√ Exquisiteness

√ Durability

Barbecue expanded net

Used to support food during barbecue.

√ Mesh uniform

√ heat conduction is good

√ non-toxic and harmless

√ can be used many times

Widely used in Japan, South Korea, Europe, America and other countries.

Scaffolding expanded net

Convenient for construction workers to move and place objects.

Ceiling expanded mesh

Mainly used for suspended ceilings in hotels, conference halls, hotels and other high-end places.

√ Beautiful appearance

√ Strong durability

√ Good ventilation effect


Short Pitch (SWM): The length of the short diagonal of the rhombus from the center of the node to the center of the node.

Long Pitch (LWM): The length of the long diagonal of the rhombus from the center of the node to the center of the node.

Short Pitch (Inner Hole) (SWD): The length of the diagonal of a short diamond-shaped hole (pictured)

Long Pitch (Internal Bore) (LWD): The length of the diagonal of a long diamond-shaped hole. (pictured)

Strand: The side of the diamond-shaped hole of the steel mesh (as shown in the figure), the width of the stem is the length of the metal plate used to make a

wire stem.

Node (Bond): The junction of two silk stems.

Thickness: The thickness of the original sheet steel.

Coil: Indicates a coiled expanded metal mesh of a specific length and width.

Mesh: Expanded mesh indicating specific length and width

Expanded Metal Panel,Expanded Metal Mesh Panels,Expanded Steel Panels,Steel Diamond Mesh Panels

HEBEI JUNTAN METAL PRODUCTS CO., LTD. , https://www.juntanmetal.com